top of page
Search

Western Power SPS Round 1

The largest deployment of Stand-alone Power Systems in Australia.


In January 2019 Hybrid Systems was selected by Western Power for the supply, delivery, installation and operation of 49 Stand Alone Power Systems as part of the SPS Round 1 Project.


Lycaon Group was engaged to design, develop and commission a range of operational technology infrastructure to support remote management and operation of the power systems.


Services & Technology Packages Provided


  • SCADA Architecture Design

  • Control Philosophy Development

  • Cellular & Satellite Communications Network Design

  • OPC & IoT Server

  • Alarms Management & SMS Notification System

  • Server & Engineering Workstation Configuration

  • PLC Programming

  • Commissioning & Factory Acceptance Testing

  • 24/7 Remote Operations Support


Next Generation Technology Providing Cost Savings


Servicing the 57 SPS units for their entire working life will save Western Power almost $6 million, compared to traditional network refurbishment.


bottom of page